Solvent-free epoxy topcoat with an orange-peel finish for slip resistance.

A two-component, solvent-free epoxy topcoat giving an orange-peel finish. Its textured surface reduces the risk of slipping while offering high surface hardness, water and chemical resistance and easy cleaning.

Technical Data

СВЯЗУЮЩЕЕ

Epoxy resin

КОМПОНЕНТЫ

Two-component (2K)

МЕСТО В СИСТЕМЕ

Textured topcoat

ПЛОТНОСТЬ

1.80 ± 0.1 kg/L

СУХОЙ ОСТАТОК ПО ОБЪЁМУ

Solvent-free (~100%)

БЛЕСК / ВИД

Orange-peel (textured) finish

ТЕОРЕТИЧЕСКИЙ РАСХОД

400 g/m² (200–225 µm dry film)

СООТНОШЕНИЕ СМЕШИВАНИЯ

9 : 1 by weight (A : B)

РАЗБАВЛЕНИЕ

Do not thin

СПОСОБ НАНЕСЕНИЯ

Roller, brush

ПОДГОТОВКА ПОВЕРХНОСТИ

Milling / shot-blasting, moisture < 4%

РАСХОД

—

ВЫСЫХАНИЕ

Dust dry 6–8 h · Touch dry 24 h · Full cure 7 days

УПАКОВКА

20 kg kit (18 kg A + 2 kg B)

ЦВЕТ

Produced on request in colours from the RAL colour chart.

ТЕХНИЧЕСКАЯ ДОКУМЕНТАЦИЯ

Применение и нанесение

ОБЛАСТИ ПРИМЕНЕНИЯ

Used where mechanical resistance is required: production and storage areas with forklift traffic, loading ramps, supermarkets, multi-storey and underground car parks, exhibition halls.

 

ПОДГОТОВКА ПОВЕРХНОСТИ И НАНЕСЕНИЕ

New concrete must be cured for at least 28 days; surface moisture must not exceed 4%. Remove weak surface layers, laitance, oil, curing compounds and old coating residues by milling, shot-blasting or diamond grinding; remove the dust with an industrial vacuum. Repair cracks and holes with epoxy repair mortar. Prime the surface with 640 Genfloor Primer; repair cracks and pits with epoxy filler. Mix components A and B with a low-speed mechanical mixer until homogeneous (at least 2–3 minutes) and apply the mix within its pot life. Apply by brush or roller. Ambient and floor temperature must be between +10 °C and +30 °C and relative humidity below 80%; floor temperature must be kept at least 3 °C above the dew point.

 

ОБЛАСТИ ПРИМЕНЕНИЯ

→ Warehouses and Logistics Centres

→ Car Parks and Ramps

 

Technical data are average values at 20 °C and 65% relative humidity. Coverage varies with surface roughness, application method and film thickness. Consult the Gen Boya technical team for project-specific system design.

КЛЮЧЕВЫЕ ПРЕИМУЩЕСТВА

— Textured (orange-peel) surface, slip resistance

— High surface hardness

— Water and chemical resistance

— Easy to clean

РЕКОМЕНДАЦИЯ ПО СИСТЕМЕ

ГРУНТ

640 Genfloor Primer

Правильная система для вашего пола — с техническими специалистами Genfloor.

Наши эксперты сопровождают проект на каждом этапе: анализ основания, замер влажности, выбор системы и расчёт расхода.

bottom of page