top of page
Gen Boya 624 Genfloor Road ambalaj görseli

ACRYLIC FLOOR AND ROAD MARKING · MARKING PAINT

624

Genfloor Road

2K · Solvent-borne epoxy · Line marking

High-adhesion epoxy line-marking paint for lanes and markings on industrial floors.

A two-component, solvent-borne, epoxy-based line-marking paint with high adhesion and mechanical strength.

Technical Data

LIGANTE

Epoxy resin

COMPONENTES

Two-component (2K)

POSICIÓN EN EL SISTEMA

Marking paint

DENSIDAD

1.65 ± 0.1 kg/L

SÓLIDOS EN VOLUMEN

50% ± 3

DILUCIÓN

016 Gen Epoxy Thinner

MÉTODO DE APLICACIÓN

Brush, roller

RENDIMIENTO

—

RENDIMIENTO

—

RENDIMIENTO

—

RENDIMIENTO

—

RENDIMIENTO

—

SECADO

—

ENVASE

—

COLOR

White, yellow and RAL colours on request

DOCUMENTOS TÉCNICOS

Uso y aplicación

USOS

Used for marking lanes and special signs in factories, assembly workshops, warehouses, aircraft hangars, car parks, cycle paths and on all industrial floors.

 

PREPARACIÓN DE SUPERFICIE Y APLICACIÓN

The surface must be clean and dry; mark out the line edges with masking tape. Mix components A and B with a low-speed mechanical mixer until homogeneous (at least 2–3 minutes) and apply the mix within its pot life. Apply by brush or roller. Ambient and floor temperature must be between +10 °C and +30 °C and relative humidity below 80%; floor temperature must be kept at least 3 °C above the dew point.

 

ÁREAS DE APLICACIÓN

→ Factories and Production Plants

→ Warehouses and Logistics Centres

→ Car Parks and Ramps

→ Roads, Cycle Paths and Walkways

 

Technical data are average values at 20 °C and 65% relative humidity. Coverage varies with surface roughness, application method and film thickness. Consult the Gen Boya technical team for project-specific system design.

CARACTERÍSTICAS PRINCIPALES

— High adhesion

— Lines resistant to forklift traffic

— Compatible with epoxy floors

— Sharp, durable marking

SISTEMA RECOMENDADO

—

El sistema adecuado para su suelo, con el equipo técnico de Genfloor.

Nuestros expertos le acompañan en cada fase del proyecto: análisis del suelo, medición de humedad, selección del sistema y cálculo de consumo.

bottom of page